Norris Water Commission
Accomplishments
2007 - 2016

2007

  • $3,000 - Sewer Service Line Replacement/Repair Program:
    • 41 West Circle Road
    • 110 Hilltop Lane
    • 52 Pine Road 

2008

  • $8.500 Water Treatment Plant
    • New siding installed on Filter Plant Building
  • $10,000 - Sewer Service Line Replacement/Repair Program:
    • 114 Dale Plae
    • 119 Orchard Road
    • 134 Orchard Road
    • 107 Dale Place
    • 73 West Norris Road
    • 89 West Norris Road
    • 101 Pine Road
    • 10 Hilltop Lane
    • 58 Pine Place - NWC Staff 

2009

  •  $546,000 Gravity Sewer Rehabilitation Project, West Norris Road Wastewater Treatment Plant:
    • Sludge PRess - new Building

2010

  • $29,000 - Energy Grant - Water Treatment Plant:
    • Window replacement 
    • Added propane tank and heater for cold weather heat
    • Sewer Line Replacement/Repair Program - 141 Garden Road
  • $10,000 - Sewer Service Line Replacement/Repair Program:
    • 115 Orchard Road
    • 92 - 98 Orchard Road
    • 192 Oak Road

2011

  • $4,000 - Sewer Line Replacement/Repair
    • 50 Dogwood Road
    • 99 Dale Road
    • 67 Hickory Trail
    • 49 Dogwood - NWC Staff
  • $10,000 - Purchased Sewer Inspection Camera

2012

  • $25,000 - Water Line Upgrade, Dair Pond - NWC Staff
    • 6" PVC to 8" ductile iron pipe with fire hydrant replaced
  • $10,000 - Sewer Service Line Replacement Program:
    • 122 Pine Road
    • 60 Pine Place (off Dogwood)
    • 129 Butternut Drive - NWC Staff
    • Smoke Tested the entire sewer Collection System - NWC Staff

2013

  • $5,000 - Manhole Lining - Inflow/Infiltration 
  • $382,00 Started CDBG - Community Development Block Grant (continued into 2014)

2014

  • CDBG continued, WWPT - Wastewater Treatment Plant Upgrade:
    • Completed New Drum Assembly
    • Upgraded lighting, wiring, roof, outfall line 10" to 12"
  • $9,000 - Sewer Line Replacement/Repair Program:
    • Hilltop Sewer Line Updrade - NWC Staff
  • $6,000 - Sewer Line Replacement/Repair Program:
    • 35 Dogwood Road
    • 31 Dogwood Road
    • 47 West Circle
    • 51 West Circle

2015

  • $291,000 Gravity Sewer Rhabilitation Project:
    • Oak Road
    • Garden Road
    • Orchard Road
    • Dale Road service line replacement

2016

  • Upcoming Sewer Line Improvement: $344,000 Sawmill Road Interceptor Improvement on new Community Development Block Grant